Maintenance of Port Trolley Brake
Release Time:
2026-05-07
Source:
Container crane domain
Summary: Installing a thruster brake (electro-hydraulic) involves mounting the brake unit onto the foundation, aligning the shoes with the brake drum.
Installation steps:
Preparation and Lifting: Unpack the brake and remove shipping bolts. Use the designated lifting point (lever/pivot block) to lift the brake. Do not lift by the push rod.
Positioning the Brake: Slacken the tie-rod nuts and spring setting nut to increase the distance between the brake shoes to clear the drum diameter.
Mounting to Base: Place the brake onto the foundation bolts, aligning the shoes with the brake drum.
Alignment: Position the brake shoes on the drum, ensuring they are centered within ±0.3plus or minus 0.3±0.3 mm of the drum surface. Use shims to adjust height if needed, ensuring the brake lever and shoes move freely.
Fixing the Brake: Tighten the foundation bolts 18.Installing the Thruster Unit:Fill the thruster tank with the recommended hydraulic oil.
Remove split pins and hinge pins (15) from the base frame and lever.Position the thruster, re-insert the pins, and replace the split pins.
Previous Page
Next Page
Previous Page
Next Page
Related Information
CONTACT US
Call us: +6012 642 6721
E-Mail: sales@ctechmachinery.com.my
Address: Lot 1128, Balakong Jaya Industrial Park 2/3, 43300 Seri Kembangan, Selangor